WE Report

Lessons Learned

Lesson Learned





No user selected

Report No.

171

Discipline/Origin

Drilling
No origin

Well

Brasse Appraisal
31/7-2 A

Date created

2017/09/28
2991 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Planning
Negative

Deepsea Bergen


What happened in Intermediate section:
Skips were not practical and required a lot of manual handling to operate. The lids are heavy and don’t sit open in an efficient manner.

What Was Planned

90 Cuttings skips sent out during section with serial no beginning SKFN

What Was Learned

Swire have a Prefix Skip SKFB, which is better than the SKFN as it has a lid which will swing up easier due to it being counterbalanced at the opposite end. Skips beginning FMS are also easier to handle.

What Actions Are Required

Ensure the optimum skip type is mobilised to the rig for future operations.